Company 2026-09-18

How we test every machine before it leaves the workshop

Every machine runs a powered test before it is packed — here is what we check, and what travels with the machine.

This is a sample article, used for layout only. The final text will be written by the factory and translated into the five site languages.

Every machine leaves our workshop after a powered test run and a checklist inspection. Photos and the inspection sheet travel with the machine.

Tell us your material, your capacity target and your voltage, and we will quote the right model within one working day.

Related news